PROPOSED MODIFICATION OF ROOF AND ALL ASSOCIATED WORKS AT KAWASAN MIEL SUNGAI WAY, LOT DU7, LOT DU8, LOT DU8A, LOT DU9, LOT DU10 AND LOT DU3 ( PHASE 1-KESM ) PETALING JAYA, SELANGOR ( PERMODALAN NASIONAL BERHAD )
Upgrade Existing Extension Roofing Work ( Supply Metal Deck & Flashing Work ) – Lot 10 ( Gridline E )

Installation New Gutter & Metal Deck – Lot 9 / Lot 10 ( Gridline D )

Installation New Gutter – Lot 9 ( Gridline C )

Installation 150mm & 300mm UPVC Pipe – Lot 10 ( Gridline D/2 )

Installation 300mm UPVC Pipe – Lot 8 / Lot 9 ( Gridline B/C )

Installation 300mm Pipe Culvert, Premix Work & Perimeter Drain ( Near Café )

Installation 750mm x 750mm Grating Perimeter Drain( Near Café )

Installation 600mm UPVC Pipe – Phase 1